Call now Free estimate

Full kitchen remodel down to the studs.

Starting over behind the walls: new plumbing, electrical, lighting and flooring, in the words of the homeowner who hired us.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Project summary

What does a kitchen remodel down to the studs include?

In this Partners Remodeling project, the client reports that the kitchen was fully demolished down to the studs. All the prep work followed: new plumbing, electrical, lighting and flooring. The new floor was matched to the existing wood in the dining room. This summary comes from the client's public Google review, and owner Maurelio stayed involved throughout.

Project
Kitchen remodel
Depth
Down to the studs
Source
Client Google review
License
CSLB #1130522

From the client review

What the homeowner says we did

Everything below comes from the review the client posted on Google.

  • Full demolition down to the studs
  • New plumbing and electrical
  • New lighting
  • New flooring, matched to the existing wood in the dining room

“the transition is flawless”

Airason H., on the floor match, Google review

Similar work

Finished kitchens from our portfolio

These kitchens are other Partners projects, shown for finish quality. The client home is not pictured.

White kitchen with a long island and bar stools
White kitchen with a long island and bar stools
Island seating under pendant lights
Island seating under pendant lights
White kitchen with a dark island and woven bar stools
White kitchen with a dark island and woven bar stools

Planning yours

When a kitchen should go to the studs

  • Plumbing or wiring needs replacing anyway
  • The layout is changing
  • Past damage is hidden behind the walls
  • You want every finish new at the same time

Opening the walls costs more up front, and it lets you fix what surface work would hide. Our cost guide lists ranges for planning.

FAQ

Questions about studs-out kitchens

Have more questions? Read the remodeling FAQ.

The finishes, cabinets and wall coverings come off until the wall framing is exposed, so plumbing and wiring can be redone.

Plumbing and electrical work generally does. Rules vary by city, and we confirm them for your address.

In this project the client reports that it did, at the dining room. Each floor is different, so we look at yours first.

We do not publish a time for this project. You get a schedule for your own scope with the estimate.

Finished white kitchen with a quartz island

Ready to start

Thinking about a full kitchen remodel?

Describe the kitchen you want, and we will come and look.