Call now Free estimate

Master bathroom remodel in the Bay Area, planned for two.

We rebuild the primary bathroom around the way you start and end the day: a double vanity with real storage, a roomy walk-in shower, a soaking tub if you want one, and light that flatters. About 6 to 10 weeks of construction.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Primary bathroom remodeling

The bathroom you use first every morning, redesigned

A master bathroom, or primary bathroom, is the private bath off the main bedroom, and it carries more of the daily routine than any other room in the house. When two people share one sink, the shower is cramped or a corner tub only collects towels, a full remodel fixes the plan, not only the finishes.

Maurelio and our crew take the room back to the studs, move the plumbing when the layout calls for it, waterproof the shower, and install the vanity, the tile, the tub and the glass. One team from demolition to the last fixture, with the permit filed for you.

  • Double vanity and storage
  • Larger walk-in shower
  • Freestanding soaking tub
  • Layout and plumbing changes
  • Lighting and ventilation
  • 6 to 10 weeks of construction

Quick answer

Remodeling a master bathroom: cost and timeline

Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Last reviewed

Partners Remodeling, a licensed contractor in Brentwood, California, remodels primary bathrooms across nine Bay Area counties. Our planning ranges are $15K to $30K for a refresh, $30K to $60K for a full remodel that keeps the layout and $60K to $120K or more for a redesigned suite with moved plumbing. Construction takes about 6 to 10 weeks, and 10 to 20 weeks from the first visit to the final walkthrough once design and permits are counted. Typical projects add a double vanity, a larger walk-in shower and a freestanding tub.

Construction
6 to 10 weeks
Visit to walkthrough
10 to 20 weeks
Planning ranges
$15K to $120K+
Permit
Filed by us

Master bathroom ideas

Primary bath ideas from suites we remodeled

All six photos come from primary bathrooms our crew finished in Bay Area homes. Use them as a starting point for a spa bathroom of your own; your room, your budget and how you use it decide the mix.

Double vanity with two undermount sinks, black faucets and two black-framed mirrors

Two sinks, two mirrors

Each person gets a sink, a mirror and a light, with drawers between them for shared things.

Black floor-mounted filler beside a white freestanding soaking tub

Freestanding soaking tub

A tub that stands free of the walls, filled by a floor-mounted spout set in the subfloor.

Large walk-in shower with a floating tiled bench, a niche and frameless glass

A shower built for two

Room for two heads, a long bench and a niche, closed in with one sheet of frameless glass.

Hexagon marble mosaic shower floor with a black linear drain

Mosaic floor, linear drain

Small hexagons grip underfoot and follow the slope toward a slim drain along the wall.

Gray marble primary bath with a freestanding tub, a glass shower and a mirrored cabinet wall

Stone from floor to ceiling

Large marble tiles on every wall, with mirrored cabinets and a lit ledge over the vanity.

Sliding wood barn door open to a primary bathroom with a double vanity

A door that slides

A barn or pocket door frees the floor space a swinging door needs between bedroom and bath.

Master bathroom layout

Primary bathroom dimensions we plan around

A good layout starts with clearances. These are the minimums set by the code and by the National Kitchen & Bath Association’s bathroom planning guidelines (opens in a new tab), next to what we aim for in a primary bath.

Minimum and recommended clearances for a primary bathroom layout
ElementMinimumWhat we aim for
Between sink centers30 in (NKBA guideline)36 in or more, so two people can stand side by side
Double vanity lengthNo code minimum60 to 72 in in most primary baths, longer when the wall allows
Toilet, center to side wall15 in (California Plumbing Code)A few extra inches when the room allows
Clear space in front of the toilet24 in (California Plumbing Code)30 in or more
Shower floor1,024 sq in, fits a 30 in circle (California Plumbing Code)About 36 by 48 in or larger for a primary shower
Freestanding tubNo code minimumEnough room to reach every side when you clean it

We confirm every measurement on site, including door swings and drawer clearance, before the layout is drawn. For the shower itself, see walk-in shower conversion; for sink and cabinet sizes, see vanity installation.

Planning your budget

What a master bath costs in the Bay Area, by level

Three planning levels for a primary bath, from new finishes in the same plan to a suite drawn from scratch. What separates them is mostly how much of the plumbing and the room itself changes.

Refresh

$15K to $30K

The plan stays, the look changes.

  • Double vanity and new top
  • Faucets, mirrors and lighting
  • Paint and new flooring
Full remodel

$30K to $60K

Back to the studs, fixtures in place.

  • New tiled walk-in shower
  • Tub replaced or removed
  • Wall and floor tile
  • Fan and electrical updated
Redesigned suite

$60K to $120K+

A new plan, often a luxury master bathroom.

  • Toilet, shower or sinks moved
  • Freestanding tub and a larger shower
  • Plans, permit and inspections

What pushes a primary bath budget up or down

1Moving the plumbingRelocating a drain means opening the floor and an inspection; leaving it in place saves the most.
2Tub and shower togetherTwo wet areas cost more than one large shower with a bench.
3Size of the roomPrimary baths are larger, so tile, waterproofing and labor scale with the square footage.
4Vanity and storageA double vanity built to size and a linen tower cost more than a stock cabinet.
5Stone and tileLarge-format slabs, natural marble and detailed mosaics take more material and more hours.
6Hidden damageOld shower pans often leak slowly; keep a reserve for subfloor or framing repairs.

Treat these levels as budgeting ranges, not a bid: the price for your own bathroom arrives in writing, item by item, once we have seen the room. For the rest of the house, compare our bathroom cost ranges or read the master bathroom cost guide.

Timeline

How long a master bathroom remodel takes

Design and the permit happen before demolition, so once the crew starts, the room is out of use for weeks, not months. Our remodeling process page explains each stage in more depth.

Freestanding tub with a black floor filler next to a glass walk-in shower in a primary bathroom Recessed shower niche lined with hexagon marble tile
Construction 6 to 10 weeks 10 to 20 weeks from first visit to walkthrough

A layout change, a custom vanity or special-order tile and glass can stretch the schedule. You get the dates in your written estimate.

  1. Free visit and measurements

    1 visit

    We measure the room, open the vanity doors and look at the plumbing, and talk about what works and what does not in your morning routine.

  2. Layout and selections

    2 to 4 weeks

    We draw the new plan, and you choose the vanity, tile, tub, glass and fixtures. You approve a line-by-line estimate.

  3. Permit

    2 to 8+ weeks

    We file the application with your city or county; review time depends on the building department.

  4. Strip-out and new rough plumbing

    1 to 2 weeks

    The room is stripped to the studs, drains, supply lines and wiring go where the new plan needs them, and the rough work is inspected.

  5. Shower, tile, tub and vanity in

    4 to 8 weeks

    The shower is waterproofed, tile goes on, then the vanity, the tub, the toilet, lighting and the glass.

  6. Walkthrough and sign-off

    1 to 3 days

    We go through every drawer, valve and switch with you, finish the punch list and pass the final inspection.

Reviews

Homeowners on their primary bathrooms

A master bath and walk-in closet remodeled together, a family that grew three bathrooms into four, and a two-bathroom job, in their own words on Google. Read all reviews.

  • Thad ApanasewiczPrimary bathroom and walk-in closet
    Maurelio (Mark) and his team were fantastic. The work they did elevated our master bathroom to a luxury status. All of the team was courteous and hard working. The price we believe was very fair as they remodeled our entire master bathroom including walk in closet at about the same price we were quoted just for the shower and tub area with an acrylic shower.
    They were flexible to our availability and determined to get the job done to our satisfaction. Mark was very helpful with design recommendations.
    Another key to their bid was that they priced out the payments so that I paid as parts of the job were completed to our satisfaction. This ensures that I’m not paying ahead of the work. Since the job was completed both Mark and Julio have reminded us to let them know if anything isn’t right and they will work to get it done to meet our needs and expectation.
    We would hire them again if the need arises. Thank you Mark, Julio, and the rest of the team.
  • Francis ToalFour bathrooms
    We had an excellent experience with our recent home renovation. We originally planned to renovate three bathrooms, but as the project progressed, we developed so much trust and confidence in Maurelio and his team that we decided to add a fourth.
    What stood out most was how easy Maurelio was to reach and work with. Whenever we had a question or needed to talk something through, he responded quickly and was always available. He was also very helpful and flexible as we worked through design choices, layouts, and materials.
    As with any major renovation, we experienced some material delays. Maurelio and his team adapted well, shifting the work as needed and staying flexible so the project could keep moving forward.
    The entire team was professional, respectful, and kept the work areas clean and organized. We’re very pleased with the quality of the work and how everything turned out. The fact that we felt comfortable adding another bathroom along the way says a lot about the trust Maurelio and his team earned from us. We would absolutely recommend them and would not hesitate to have Maurelio and his team back for future projects in our home.
  • James GangarTwo bathrooms
    Maurelio from Partners Remodeling was excellent. We used his company to remodel two bathrooms in our house. His was the best price out of the 3 quotes we obtained. Maurelio helped us every step of the way from design, choosing material and letting us know when to buy it, and making sure the vanities and other finishing materials we chose were compatible. We had an excellent experience and plan to use Partners Remodeling again soon.

Service areas

Primary bathrooms remodeled across nine Bay Area counties

From our base in Brentwood we remodel master bathrooms in Walnut Creek, Concord, Antioch, Danville, Oakland, San Jose and the rest of Contra Costa County and the eight counties around it. Measuring your bathroom costs nothing.

Free estimates in all 9 counties

Do we remodel homes in your city?

Type your city to check instantly.

37cities
9counties
24/7we answer

Loading map...

Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.

FAQ

Master bathroom remodel FAQ

Budget, schedule, layout and living at home during the work. General bathroom questions are answered in the bathroom remodeling FAQ.

Our planning ranges are $15K to $30K for a refresh, $30K to $60K for a full remodel that keeps the toilet, shower and sinks where they are, and $60K to $120K or more when the layout changes. Room size, tile and stone, a tub plus a separate shower, and damage found behind the old walls move the number. See the three budget levels.

About 6 to 10 weeks of construction, from demolition to the final walkthrough. Counting the first visit, design and the permit, most projects take 10 to 20 weeks in total. Special-order items such as a custom vanity or shower glass are scheduled so they arrive when the crew needs them.

None: both names describe the bathroom attached to the main bedroom. Many builders and listings now say primary bathroom or primary suite, while master bath is still the more common search. We remodel both, whatever you call yours.

Keep one if you take baths or if this is the only tub in the house, since families with young children often look for one. If there is a tub in another bathroom and you never use this one, a larger walk-in shower with a bench is usually the better use of the space. We sketch both options at the visit.

Yes, and many of the primary baths we remodel end up with no tub at all. The space goes to a larger walk-in shower with a bench, a second shower head and a niche, which most couples use every day. If another bathroom in the house keeps a tub, buyers rarely miss this one. See how we build them on our walk-in shower conversion page.

Yes. This Brentwood master bathroom shows the room during demolition and finished, with two short walkthrough videos.

Yes. We have remodeled a primary bathroom together with its walk-in closet, and one of our Google reviewers describes that project. Doing both at once lets the flooring, paint and trim run through both rooms and saves a second round of dust.

Yes. Moving fixtures means rerouting drains, vents and supply lines under the floor and inside the walls, which needs a permit and a rough plumbing inspection. It is what separates the redesigned suite level from a full remodel in the same layout, so we price it as its own line.

The National Kitchen & Bath Association recommends 36 inches between sink centers, with 30 inches as the minimum, so most double vanities in a primary bath are 60 to 72 inches long. Below about 60 inches, one sink on a wider vanity often gives more usable counter.

Almost always. Replacing a shower, moving plumbing or adding circuits and a new fan is permitted work in Bay Area cities and counties. We prepare and file the application and schedule the inspections; the review time is part of the 10 to 20 week total.

In most cases, yes, as long as there is another bathroom in the house. We close off the work area with dust barriers, protect the bedroom floor and the path in, and sweep up before we leave every evening.

Primary bath guide

Planning a master bathroom remodel: layout, comfort and budget

The decisions that shape a primary bathroom, in the order we work through them with homeowners at the first visit.

Master bath or primary bath?

They are the same room: the private bathroom attached to the main bedroom. Builders, listings and design magazines have been moving to "primary bathroom" or "primary suite," while many homeowners still search for "master bath." On this page we use both, and either word works when you ask us for an estimate.

What sets this room apart from a hall or guest bathroom is who uses it and how. Two adults often get ready at the same time, so counter space, storage and a shower that does not compete with the sink matter more here than anywhere else in the house.

Keep the layout or redraw it?

The single biggest cost decision is whether the toilet, the shower drain and the sinks stay where they are. Keeping them in place lets the budget go into tile, glass and cabinetry. Moving them means opening the floor, rerouting drains and vents, and a permit with a rough plumbing inspection.

Redrawing is worth it when the current plan does not work: a cramped shower beside an unused corner tub, a single sink for two people, or a toilet facing the bedroom door. We sketch both options at the visit so you can see what each one buys.

Master bathroom remodels with Partners at a glance
  • Planning ranges of $15K to $30K, $30K to $60K and $60K to $120K+
  • About 6 to 10 weeks of construction; 10 to 20 weeks from first visit to walkthrough
  • Double vanities, walk-in showers and freestanding tubs
  • Plumbing moved when the layout changes, with permits filed for you
  • Free in-home visit and a line-by-line written estimate
  • California license CSLB #1130522

Freestanding tub, shower only, or both?

A freestanding soaking tub is the centerpiece many people picture, but it needs floor space on every side to look right and to be cleaned. If you rarely take baths, giving that space to a larger walk-in shower with a bench is often the better use of the room.

If another bathroom in the house still has a tub, removing the one in the primary bath rarely matters to buyers. If this is the only tub, think about keeping one somewhere. A floor-mounted filler suits a tub in the middle of the room; a wall-mounted one costs less to install when the tub sits against a wall.

Clearances that make the room comfortable

The California Plumbing Code sets minimum clearances, and the NKBA, the national kitchen and bath trade group, publishes more generous planning guidelines. For a double vanity, the association recommends 36 inches between sink centers, with 30 inches as the minimum. Around the toilet, the code requires 15 inches from its center to a wall or fixture and 24 inches of clear space in front.

A shower must have at least 1,024 square inches of floor and room for a 30-inch circle, but most primary showers are planned well above that so two shower heads or a bench can fit. We check door swings, drawer clearance and the path from the bedroom before any measurement is final.

Light, ventilation and power

A primary bath works best with layered light: recessed or ceiling fixtures for the room, sconces or a lit mirror at face height for each sink, and a dimmable option for evenings. Bathroom outlets must be GFCI protected, and an outlet inside a vanity drawer keeps hair tools off the counter.

Moisture is the enemy of every finish in the room. A quiet exhaust fan, sized to the room and ducted outdoors, protects the paint, the grout and the cabinets. The electrical and ventilation work is inspected with the rest of the permit before the walls are closed.

How to spend a master bath budget well

Our planning ranges are $15K to $30K for a refresh, $30K to $60K for a full remodel in the same layout and $60K to $120K or more for a redesigned suite. The money goes furthest when the plumbing stays put and the budget is spent on the surfaces you touch every day: the vanity top, the shower floor and the faucets.

Keep a contingency for what sits behind the old tile, because a slow leak under a shower pan is common in older homes. Read our master bathroom cost guide for more detail, and bring your questions to the free visit, where we price your own room.

Primary bath with a frosted sliding glass door, a soaking tub and a hexagon mosaic floor

Ready to start

Let’s redesign your primary bath

Book a free visit: we measure the room, sketch the layout options with you and talk through the tub, the shower and the vanity. Your written estimate shows every line and the schedule.