Call now Free estimate

Interior remodeling in the Bay Area, one room or every room.

Walls opened, drywall repaired, rooms painted, lighting added, trim and doors replaced, all by one licensed crew. Paint and floors in a few rooms take 1 to 3 weeks; a fully reworked interior takes 3 to 6 months.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Interior remodeling contractor

The rooms between the kitchen and the bath deserve a plan too

The living room, bedrooms, hallways, stairs, laundry room and home office are where most of the day happens, and where an older Bay Area house shows its age first: closed-off rooms, dark ceilings, patched walls and tired trim. An interior remodel fixes the layout, the surfaces and the light together.

Maurelio and our crew handle the whole sequence: framing and beams when a wall comes out, wiring and recessed lights, drywall, paint, doors and trim. We also take painting or drywall repair as a job on its own.

  • Walls opened, beams installed
  • Drywall repaired or replaced
  • Interior painting
  • Recessed lighting and circuits
  • Doors, baseboards and crown
  • Engineer and permit handled

Quick answer

Interior remodeling: cost and time on site

Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Last reviewed

Partners Remodeling, a licensed contractor based in Brentwood, California, remodels home interiors across nine Bay Area counties. Paint, flooring and trim in a few rooms usually take 1 to 3 weeks and fall in a $5K to $25K planning range. Several rooms with new finishes, doors and lighting take 4 to 8 weeks, at $30K to $80K. Opening walls and reworking the interior takes 3 to 6 months, from $80K to $200K or more. Load-bearing walls are removed with an engineer, a beam and a permit.

A few rooms
1 to 3 weeks
Several rooms
4 to 8 weeks
Walls opened
3 to 6 months
Planning ranges
$5K to $200K+

Interior remodeling services

What we change inside your home

Every photo is a room our crew framed, finished or painted. Combine the services you need; each one gets its own line in the estimate.

Open living and dining area seen from a staircase, with a sofa, a dining counter and an entry door

Walls opened, rooms joined

An open floor plan joins kitchen, dining and living room; bearing walls are replaced by an engineered beam.

New drywall taped and mudded around tall windows during an interior build

Drywall repair and new drywall

Holes, cracks and water damage repaired, or new board hung, taped and textured to match.

Freshly painted room with mirrored closet doors, a window and plank flooring

Interior painting

Walls, ceilings, trim and doors prepped and painted, a single room or the whole house.

Loft bedroom with recessed lights in a vaulted ceiling and a wood beam

Recessed lighting

LED recessed lights, dimmers and new circuits, wired by our own crew and inspected.

White room with sliding closet doors, new interior doors and baseboards

Doors, trim and closets

Interior doors, baseboards, casing, crown molding and closet doors fitted and painted.

Empty room with new plank flooring, white baseboards and a doorway to a bathroom

New floors

Hardwood, engineered wood, vinyl plank or tile laid before the trim goes on.

Flooring on its own has a page of its own: flooring installation.

Rooms we remodel

Interior rooms we remodel across the Bay Area

Each room has its own priorities. These are the ones we hear about most at the first visit.

Living and family rooms

A living room opened to the kitchen as an open floor plan, layered lighting on dimmers and one floor running through the whole space.

Bedrooms and suites

New closet doors, a ceiling fan box, recessed lights, fresh paint and quieter floors.

Laundry rooms

Cabinets and a counter over the machines, durable wall paint and lighting you can see stains under.

Home offices

A den or spare room turned into an office, with outlets where the desk goes and light that works for video calls.

Hallways and stairs

Patched and repainted walls, new railings and balusters, and lighting along the path at night.

Ceilings and walls

Old textures smoothed, cracks repaired, soffits removed and ceilings opened for new light.

Kitchens and bathrooms have their own pages: kitchen remodeling and bathroom remodeling.

Smaller jobs welcome

Interior painting and drywall repair on their own

Not every project needs a remodel. We take painting and drywall work as standalone jobs, with the same crew and the same written estimate.

Interior painting

Walls, ceilings, trim and doors

Furniture moved and covered, holes filled, gaps caulked and stains primed before two finish coats in the sheen each surface needs.

Good for
A new color, a sale or a move-in
Schedule
Dates set in your estimate
You stay home
Yes, room by room
Drywall repair

Holes, cracks and water damage

Damaged board cut back and replaced, seams taped, three coats of mud and the texture matched so the patch blends into the wall.

Good for
Doorknob holes, settling cracks, old leaks
Finish
Smooth, orange peel or knockdown
Paint
Primed and painted to match

Drywall soaked by a leak is replaced only after the source is fixed and the framing is dry. Painting time depends on the number of rooms, ceiling height and repairs; your estimate lists the dates.

Planning your budget

What an interior remodel costs in the Bay Area

Three levels, from fresh surfaces in a few rooms to an interior with walls moved. The biggest jump comes when the structure or the wiring changes.

Refresh

$5K to $25K

A few rooms, 1 to 3 weeks.

  • Interior paint
  • New floors and baseboards
  • Drywall repairs and light fixtures
Several rooms

Between $30K and $80K

New finishes, 4 to 8 weeks.

  • Doors, casing and crown molding
  • Recessed lighting and dimmers
  • Ceilings smoothed or retextured
  • Floors and paint throughout
Reworked interior

From $80K to $200K+

Walls opened, 3 to 6 months.

  • Load-bearing wall and beam
  • New circuits and lighting plan
  • Engineering, permit and inspections

What moves an interior budget

1Bearing wallsAn engineer, a beam, posts and a permit add cost that a non-bearing wall does not.
2Square footagePaint, drywall and flooring are priced by the area of walls, ceilings and floors.
3Ceiling heightVaulted and two-story rooms need scaffolds or lifts and more hours.
4Electrical workNew circuits, more recessed lights or a panel that is already full.
5Surface conditionCracked plaster, many patches or texture removal before paint.
6Trim and doorsProfile, material and how many openings get new casing and doors.

Use these ranges to plan, not as a bid; the figure for your rooms arrives in writing, item by item, after we walk through the house. For whole-house projects, see our home remodeling cost ranges.

How it works

How an interior remodel runs, step by step

The messy work comes first and the finishes last, so nothing new gets scraped. Our remodeling process page covers each stage in more detail.

Double-height room with new drywall taped and ready for finishing, tall windows and a lift Scissor lift used to finish high drywall ceilings inside a home
Work on site 1 week to 6 months depending on how much of the interior changes

1 to 3 weeks for paint and floors in a few rooms, 4 to 8 weeks for several rooms of finishes, and 3 to 6 months when walls are opened. Permit review comes before the start date.

  1. Walkthrough and wall check

    1 visit

    We walk every room with you, look in the attic or under the floor to see which walls carry load and note the wiring and the surfaces.

  2. Plan, colors and finishes

    Before work starts

    Layout, lighting plan, paint colors, doors and trim chosen. You approve a written estimate with every line and the dates.

  3. Engineer and permit

    When walls or circuits change

    The engineer sizes the beam, and we file the permit. Paint, floors and repairs without new wiring usually skip this step.

  4. Protection, framing and wiring

    First part of the schedule

    Floors and furniture covered, dust walls up, then the wall comes out, the beam goes in and new wiring and light boxes are inspected.

  5. Drywall, paint, floors and trim

    Most of the schedule

    Board hung and finished, ceilings and walls painted, floors laid, then doors, baseboards and casing installed and painted.

  6. Final check with you

    Last day

    We switch on every light, open every door and touch up anything you point out before final inspection and cleanup.

Reviews

Homeowners on the rooms we remodeled

A family room transformed, a den turned into an office and a painting job finished sooner than expected, as the homeowners put it on Google. Read all reviews.

  • Akiko HFamily room remodel
    I recently had my family room remodeled by Partners Remodeling, and the results have truly exceeded my expectations!! Maurelio and the team took the time to listen to my ideas and needs, and came up with great recommendations and solutions that really elevated the space. They were respectful of my home, showed up on time, worked efficiently, and left everything clean and tidy at the end of each day. That I really appreciated.
    My family room has been completely transformed into a warm and inviting space. I feel like I’m living in a brand new home. 😊 We couldn’t be happier with the experience. Highly recommend Partners Remodeling for anyone looking to remodel their home!!
  • Izabela KhanDen converted to an office
    We had an amazing experience with Maurelio from Partners Remodeling. They converted den into an office, and the entire process was smooth from start to finish. The team was extremely professional, prompt, efficient, and kind. They were very knowledgeable and mindful, and every person involved in the project was personable and respectful.
    They wrapped and protected the house before starting, kept everything very clean throughout the job, and maintained excellent organization from beginning to end. Their pricing was fair and reasonable, and the quality of work exceeded our expectations. Customer service was outstanding and made us feel comfortable and confident every step of the way. We truly couldn’t be happier with the results and highly recommend them.
  • C CGeneral construction and painting
    Maurelio and his team are fantastic. From my initial inquiry and throughout the entire job they were transparent and communicated everything along the way. The work was done faster than I had anticipated which was wonderful. We will definitely be using them in the future for other home projects.

Service areas

Interior remodeling in nine Bay Area counties

Based in Brentwood, our crew opens walls, paints and rewires rooms in Concord, Walnut Creek, Antioch, Pleasanton, Oakland, San Jose and across Contra Costa County and eight more counties. The walkthrough is free.

Free estimates in all 9 counties

Do we remodel homes in your city?

Type your city to check instantly.

37cities
9counties
24/7we answer

Loading map...

Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.

FAQ

Interior remodeling FAQ

Walls, drywall, painting, lighting and permits. Questions about remodeling the whole house are answered in the home remodeling FAQ.

Our planning ranges are $5K to $25K for paint, floors and trim in a few rooms, $30K to $80K for several rooms with new doors, lighting and finishes, and $80K to $200K or more when walls are opened and the interior is reworked. Ceiling height, the condition of the walls and any structural or electrical work move the number. See the three budget levels.

About 1 to 3 weeks on site for paint and floors in a few rooms, 4 to 8 weeks for several rooms of finishes, and 3 to 6 months when walls come out and the interior is rebuilt. When an engineer and a permit are needed, that review happens before the start date.

The square footage alone does not set the price; what you change in it does. Using our planning ranges, refreshing the paint, floors and trim in a few rooms runs $5K to $25K, new finishes, doors and lighting across several rooms $30K to $80K, and an interior with walls opened and new circuits $80K to $200K or more. Kitchens and bathrooms are priced separately. After the walkthrough you get a written estimate room by room.

Yes. A structural engineer designs the beam and the posts that replace the wall, we file the permit, and the framing is inspected before it is closed. The beam can hang below the ceiling or sit flush inside it; a flush beam looks cleaner but takes more framing work.

A non-bearing wall without wiring or plumbing inside is the simplest case. A bearing wall adds engineering, a beam, posts, a permit and the repairs to the floor and ceiling around it, which is why open floor plans usually fall in our $80K to $200K+ level when they come with new finishes. We price your wall after looking in the attic or crawl space.

Yes. We paint single rooms or whole houses as a standalone job: walls, ceilings, trim and doors, with the prep work done first. We also take drywall repair on its own and paint the patch to match.

Usually, yes. After the patch is taped and finished, we match the wall around it, whether smooth, orange peel or knockdown, then prime and paint. Very old or hand-troweled textures can be harder to match exactly, so we sometimes recommend refinishing the whole wall.

Our own crew. We lay out the lights with you, run the wiring, install the fixtures and dimmers and patch the ceiling. New circuits are permitted and inspected, and California's Title 24 energy code sets the efficiency of the fixtures we use.

Paint, floors, trim and drywall repairs generally do not. Removing or moving walls, adding circuits and lights or changing the framing usually does, and a bearing wall also needs an engineer. We prepare and file the application and schedule the inspections.

In most cases, yes. We cover floors and furniture, set up dust walls around the rooms in progress and clean up every evening. For a large structural job, we tell you ahead of time which days a room or a path through the house will be closed.

Interior remodeling guide

Planning an interior remodel: walls, drywall, paint and light

What happens inside the walls and ceilings of an interior remodel, and the questions worth settling before the first wall comes down.

What counts as an interior remodel?

An interior remodel changes the rooms you live in without adding square footage: living and family rooms, bedrooms, hallways, stairs, laundry rooms and home offices. It can be as light as new paint, trim and lighting, or as deep as removing walls to join the kitchen, dining and living areas.

Kitchens and bathrooms have their own pages because their plumbing, cabinets and tile make them projects of their own, see kitchen remodeling and bathroom remodeling. When the whole house is changing at once, start with our home remodeling page.

Is that wall load-bearing?

A wall that carries the floor or the roof above cannot simply come out. Clues include walls running perpendicular to the ceiling joists, walls near the center of the house and walls stacked under another wall upstairs, but only a look in the attic or under the floor, and an engineer, can confirm it.

When a bearing wall is removed, the engineer sizes a beam and the posts that carry it down to the foundation. A dropped beam hangs below the ceiling and costs less; a flush beam sits inside the ceiling for a clean line but takes more framing. Either way the city reviews the plan and inspects the framing before it is closed.

Interior remodeling with Partners at a glance
  • Planning ranges of $5K to $25K, $30K to $80K and $80K to $200K+
  • Paint and floors in a few rooms: 1 to 3 weeks; several rooms: 4 to 8 weeks
  • Opened walls and a reworked interior: 3 to 6 months
  • Load-bearing walls removed with an engineer, a beam and a permit
  • Recessed lighting and circuits installed by our own crew
  • California license CSLB #1130522

Drywall repair or new drywall?

Holes, cracks at door corners and seams that show through paint are usually repaired: cut back to solid board, patched, taped, and finished in three coats so the repair disappears. Texture is then matched to the wall around it, whether smooth, orange peel or knockdown, which is the step that makes a patch invisible.

Drywall that got wet, sags or hides old wiring is better replaced. Once it is open, it is the cheapest moment to add insulation, blocking for a TV or shelves, and outlets where you actually need them. If an older ceiling has a popcorn finish, have it tested before it is disturbed.

Interior painting that lasts

Most of a paint job is preparation: moving and covering furniture, filling holes, sanding, caulking trim gaps and priming patches and stains. Skipping it is why a fresh coat can still show every flaw once the light hits the wall from the side.

Sheen matters as much as color. Flat or matte hides imperfections on ceilings and bedroom walls; eggshell is easier to wipe in living areas and hallways; satin or semi-gloss stands up to hands and mops on trim, doors and baseboards. We paint as a job on its own or as the last stage of a larger remodel.

Planning recessed lighting

Recessed lights work best on a plan: spaced evenly from the walls, aimed at counters, art and reading spots, and split into zones on dimmers so one room can feel bright or calm. Slim LED fixtures need little ceiling depth, which helps under floors and in older homes with shallow framing.

California's Title 24 energy code sets efficiency and control rules for new lighting, and every new circuit is inspected. Our crew runs the wiring while the ceiling is open or fishes it through with small access holes, then patches and paints them.

In what order does the work happen?

Anything that opens walls or ceilings goes first: framing, a beam, wiring and lighting boxes. Then insulation and drywall, then paint on ceilings and walls. New flooring follows, and baseboards, casing and doors are installed and painted last, so nothing finished is scraped by the work after it.

If you are doing the house in stages, finish the messy work in a room before the final coats, and keep the same paint colors and trim profile written down so later rooms match. We give you that list with the estimate.

Remodeled loft bedroom with a vaulted ceiling, recessed lights and a black stair railing

Ready to start

Let’s rethink the rooms you live in

Book a free walkthrough: we check which walls carry load, look at the wiring and the surfaces, and talk through color, light and trim. Your written estimate lists every room and the dates.