Call now Free estimate

Walk-in shower conversion in the Bay Area, from tub to tile.

We take out the bathtub you no longer use and build a tiled walk-in shower in its place, waterproofed from floor to ceiling, with glass, niches, a bench or grab bars if you want them. About 1 to 2 weeks of work.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Tub-to-shower conversions

The tub nobody uses, turned into the shower everyone wants

In many Bay Area homes the bathtub is mostly a high wall to climb over on the way into the shower. A tub-to-shower conversion, the most common walk-in shower remodel we do, replaces it with a shower that is easier to step into, easier to clean and safer as you get older, usually in the same footprint, so the toilet and the vanity stay where they are.

Maurelio and our crew remove the tub, update the drain and the valve, build a sloped and fully waterproofed shower floor and set the tile and the glass. We build tiled showers only, no plastic panels, and when the floor structure allows it, the entry can be curbless.

  • Tub out, tiled shower in
  • Waterproofed floor to ceiling
  • Curbless when the floor allows
  • Niches, benches and glass
  • Grab bars on solid backing
  • About 1 to 2 weeks

Quick answer

Converting a tub to a walk-in shower: what to expect

Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Last reviewed

Partners Remodeling, a licensed contractor in Brentwood, California, converts bathtubs into tiled walk-in showers across nine Bay Area counties. The work takes about 1 to 2 weeks on site: the tub comes out, the drain and valve are updated, the floor is sloped and waterproofed, and the tile, fixtures and glass go in. Most conversions fall in a $8K to $20K planning range. Curbless entries are built when the floor structure allows, and niches, benches, frameless glass, grab bars and handheld showers can be added.

Work on site
1 to 2 weeks
Planning range
$8K to $20K
Curbless entry
When the floor allows
Shower walls
Tile over waterproofing

Walk-in shower ideas

Walk-in shower features from showers we built

Every photo is a shower we built in a Bay Area home. Mix the features you want; each one is planned before the tile goes up and priced as its own line.

Walk-in shower with a frameless glass door and gray marble-look tile

Frameless glass

A clear door or fixed panel with no metal frame, measured to the finished tile.

Black linear drain along a marble-look scallop tile shower floor

Linear drain

A long drain against one wall lets the floor slope one way, the key to a curbless entry.

Two recessed shower niches lined with copper penny mosaic tile

Recessed niches

Shelves built into the wall for shampoo, waterproofed and framed in an accent tile.

Built-in shower bench with a white top against emerald green tile

Built-in bench

A tiled seat for shaving, washing feet or resting, framed and waterproofed with the walls.

Rainfall shower head and handheld shower on a slide bar with gray plank tile

Rainfall and handheld

An overhead rainfall head plus a handheld shower on a slide bar, run from one valve.

Walk-in shower tiled floor to ceiling with stacked niches

Tile to the ceiling

Tile and waterproofing carried all the way up for a clean look and easy cleaning.

The conversion, step by step

What a tub-to-shower conversion includes, stage by stage

The same six stages as any shower remodel we build, done by one crew, so nothing falls between trades.

Tub and surround removed

The old tub, the surround and the damaged drywall come out, and the floor and the studs are checked for water damage.

Drain and valve updated

The drain is moved or replaced for the new shower floor, and a new valve is set for the shower head and handheld.

Sloped, waterproofed floor

The shower floor is sloped to the drain and covered, with the walls, by a continuous waterproof membrane.

Tile walls and floor

Wall and floor tile go on, with niches and a bench if you chose them, and the grout and the corners are sealed.

Fixtures and grab bars

Shower head, handheld, controls and grab bars are installed, the bars anchored into blocking added inside the walls.

Glass and final check

Frameless glass is measured after the tile and installed last; we test the shower with you before we leave.

How it works

How your tub becomes a walk-in shower

Choices and the permit come first, so the work on site moves without waiting. If the rest of the bathroom is changing too, see how a full bathroom remodel works.

Marble-look walk-in shower with a recessed niche and a frameless glass door Pebble mosaic shower floor sloped toward the drain
Work on site 1 to 2 weeks from tear-out to the first shower

A curbless entry, a moved drain or water damage under the old tub can add days. Permit review time depends on your city and is counted before work starts.

  1. Visit and floor check

    1 visit

    We measure the tub space, look at the plumbing and check whether the floor is a slab or wood-framed, which decides if curbless is practical.

  2. Tile, glass and fixtures chosen

    Before work starts

    Pick the tile, the glass, the fixtures and any niche, bench or grab bars. You approve a line-by-line estimate, and we file the permit.

  3. Tear-out, plumbing and waterproofing

    First days on site

    The tub comes out, the drain and valve are updated, the floor is sloped and the waterproofing goes on and is inspected.

  4. Tile, fixtures, glass and walkthrough

    Rest of the 1 to 2 weeks

    Tile and grout, fixtures and grab bars, then the glass. We test everything with you before handing over the shower.

Reviews

Homeowners on the showers we built

Three Google reviews: a cracked shower pan fixed before a home sale, a primary shower that took over the old tub area and a full bathroom that was first class. Read all reviews.

  • F FosterShower remodel
    Can not say enough good things about our shower remodel and service from Partners Remodeling, Maurelio and his highly skilled team.
    We are getting house ready to sell and wanted to address a cracked floor pan and upgrade the shower to look first class.
    Maurelio and team provided a detailed and reasonable scope of work and delivered on every element splendidly.
    They repaired foundation issues we did not know about, offered great suggestions for improvements and provided impeccable service. They are on time, neat, personable and masters of their craft.
    If you are looking to upgrade your home, you can trust Partners Remodeling to get it done very well.
    Remodeled shower with marble-look walls, a new pan and a sliding glass doorRemodeled shower seen from the side, with the new sliding glass enclosure
  • Thad ApanasewiczPrimary bathroom and walk-in closet
    Maurelio (Mark) and his team were fantastic. The work they did elevated our master bathroom to a luxury status. All of the team was courteous and hard working. The price we believe was very fair as they remodeled our entire master bathroom including walk in closet at about the same price we were quoted just for the shower and tub area with an acrylic shower.
    They were flexible to our availability and determined to get the job done to our satisfaction. Mark was very helpful with design recommendations.
    Another key to their bid was that they priced out the payments so that I paid as parts of the job were completed to our satisfaction. This ensures that I’m not paying ahead of the work. Since the job was completed both Mark and Julio have reminded us to let them know if anything isn’t right and they will work to get it done to meet our needs and expectation.
    We would hire them again if the need arises. Thank you Mark, Julio, and the rest of the team.
  • Laurie EmeryBathroom remodeling
    Maurelio and his team are amazing. They remodeled our bathroom and it was a smooth and easy experience. There was great communication every step of the way and the work is first class.

Service areas

Walk-in showers built across nine Bay Area counties

Our crew drives out from Brentwood to build walk-in showers in Antioch, Concord, Walnut Creek, Oakland, Fremont, San Jose and the rest of Contra Costa County and our nine counties. The floor check and the quote cost nothing.

Free estimates in all 9 counties

Do we remodel homes in your city?

Type your city to check instantly.

37cities
9counties
24/7we answer

Loading map...

Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.

FAQ

Walk-in shower conversion FAQ

Cost, timing, permits and curbless entries, answered. More bathroom questions are in the bathroom remodeling FAQ.

Most conversions fall in our $8K to $20K planning range. The price depends on the size of the shower, the tile, the glass, niches and benches, and whether the drain or the valve moves. A curbless entry, a larger custom shower or water damage under the old tub push it higher; larger showers built as part of a full remodel run into the $20K to $45K range. See our bathroom cost ranges.

About 1 to 2 weeks of work on site. Waterproofing has to be finished and inspected before tile, and frameless glass is measured after the tile is set, so those steps set the pace. Permit review comes before the start date and depends on your city.

Usually, yes. Replacing a tub with a shower changes the drain and the valve, which most Bay Area building departments treat as permitted plumbing work. We prepare the application, file it with your city or county and schedule the inspections.

Often, yes. A curbless entry needs the shower floor recessed below the bathroom floor. On a wood-framed floor the joists can usually be lowered; on a concrete slab the slab has to be cut. We check your floor at the visit and, if curbless is not practical, build a low curb that is still easy to step over.

Tile. We build walk-in showers with tile or porcelain over a full waterproof membrane, not prefabricated acrylic panels. Tile lets us add niches, benches and a curbless entry and gives you any look you want, from large marble-look slabs to small mosaics.

They are different products. Liner and panel systems, sold by national bath brands, fit molded acrylic walls and a base over or in place of the old tub, which is usually quick and simple to clean. A tiled shower is built from the studs out, with a sloped floor and a waterproof membrane under tile, so it can take any size, a curbless entry, niches and a bench. We build tiled showers only; if a liner system fits your goals better, it is worth getting a quote from a company that specializes in it.

It depends on the house. Families with young children often look for at least one tub, so if this is your only tub, think about whether a buyer would miss it. Converting a tub in a home that has another one, or in a primary bathroom, is usually an easy decision. We talk it through at the visit.

Yes. We add blocking inside the walls for grab bars, even ones you might install later, and build tiled benches and niches as part of the shower. Handheld showers on a slide bar and rainfall heads run from the same new valve.

Original Medicare generally does not pay for bathroom remodeling or home modifications such as a walk-in shower. Some other plans or local programs may help with accessibility changes, so check with your plan or your county before you start. We can provide a written estimate for any program that asks for one.

Walk-in shower guide

Turning a tub into a walk-in shower: a practical guide

What happens under the tile, how big the shower can be and which features make it safer, explained before your visit.

What goes under the tile

A tiled shower is only as good as the layers you never see. After the tub comes out, the floor gets a pan sloped toward the drain, and a waterproof membrane covers the floor, the walls and the corners up past the shower head. Niches and benches are waterproofed the same way before any tile goes on.

The drain is part of that system. A center drain needs the floor sloped from all sides, which suits smaller tiles; a linear drain along one wall lets the floor slope in one direction, so large tiles can be used and a curbless entry is easier. Both are built and inspected before the walls are tiled.

How big can the shower be?

A standard tub alcove is about 60 by 30 inches, and a walk-in shower usually takes the same footprint, so the walls, the toilet and the vanity stay where they are. The plumbing code sets a minimum shower floor of 1,024 square inches with room for a 30-inch circle, and a converted tub space comfortably exceeds it.

If the bathroom allows, borrowing a few inches from a closet or a neighboring wall makes a roomier shower with space for a bench. That turns the job into a layout change, which we price as an option so you can compare.

Tub-to-shower conversions with Partners at a glance
  • Tiled showers built over full waterproofing, no prefabricated panels
  • Curbless entry when the floor structure allows it
  • About 1 to 2 weeks of work on site
  • Niches, benches, frameless glass, grab bars and handheld showers
  • Permits filed and inspections scheduled for you
  • California license CSLB #1130522

Curbless showers: what the floor decides

A curbless or zero-entry shower has no step: the bathroom floor runs straight into the shower. To keep water in, the shower floor has to sit lower than the rest of the room, which means recessing it into the structure.

On a wood-framed floor, the joists under the shower can often be lowered or reframed. On a concrete slab, common in single-story Bay Area homes, the slab has to be cut and the drain reset. We check which one you have at the visit, and when a full curbless entry is not practical, a low curb still gives an easy step-in.

Frameless glass, a fixed panel or no door

Frameless glass keeps a walk-in shower bright and makes a small bathroom look bigger, with no metal frame to clean around. A hinged door suits most alcoves; a fixed panel without a door works when the shower is long enough to keep the spray inside.

Glass is measured after the tile is set, because it must fit the finished walls exactly, and it is usually installed near the end of the job. A doorless design skips that step but needs enough length and a well-placed shower head to stay dry.

Safety features worth planning in

Grab bars only hold if they are anchored into solid backing, so we add blocking inside the walls before they are closed, even for bars you might install later. A built-in or fold-down bench, a handheld shower on a slide bar and a slip-resistant floor tile make the shower easier to use at any age.

Controls placed near the entry let you turn the water on and adjust it without stepping under a cold spray. These details cost little when they are planned before the tile and much more to add afterward.

What drives the cost of a conversion

Most tub-to-shower conversions fall in our $8K to $20K planning range. The price moves with the size of the shower, the tile you choose, the glass, the number of niches and benches, and whether the drain or the valve has to move. A curbless entry, damaged subfloor or rotten framing found behind the old tub add to it.

You get a line-by-line estimate after the free visit. If you are also thinking about a new vanity or a full remodel, see vanity installation and our bathroom cost ranges.

Gray marble walk-in shower with a frameless glass enclosure

Ready to start

Let’s retire your bathtub

Book a free visit: we measure the tub space, check your floor for a curbless entry and help you choose tile, glass and features. Your written estimate lists every line and the dates.