
Garage Conversions & ADUs
A garage turned into a bedroom suite, or a backyard ADU with its own kitchen and bathroom, for family, guests or rental income.
Family-owned whole-home remodeling, from interior updates and new flooring to ADUs and garage conversions. Quoted, managed and built by the same father-and-son team. State license CSLB #1130522.
Bay Area home remodeling
Partners Remodeling began as a father-and-son business in Brentwood, and Maurelio and João Luiz still lead every job. In more than 15 years across nine Bay Area counties we have handled new floors and interior updates, whole-house remodels, ADUs and garage conversions. A few rooms or a complete home renovation, one home remodel contractor answers for the entire project.
A whole-home remodel touches every trade at once: structure, plumbing, electrical, kitchens, bathrooms, floors and the exterior. We plan the order of the work with you, handle the plans and permits with your city and build it with our own crew, bringing in a licensed partner only for new foundations and framing, so nothing falls between contractors.
Quick answer
Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Information current as of
A home remodel in the Bay Area typically costs $30K to $70K to update several rooms with a limited scope, such as paint, flooring and finishes without major layout changes. A larger remodel with new kitchens, bathrooms and flooring runs $70K to $180K. A whole-house renovation starts at about $180K to $500K or more, and structural work can cost significantly more. On site, a phase of one or two rooms typically takes 4 to 12 weeks. A whole house done at once takes about 4 to 8 months, plus time for design and permits. Partners Remodeling, a licensed (CSLB #1130522) family company from Brentwood, plans the phases, files the permits and builds with its own crew in every Bay Area county.
Prices are estimates only and vary by home size, project scope, materials, and structural requirements. Your final cost is confirmed in a detailed written estimate.
What we do
Whether it is new floors in a few rooms, a full home renovation or a backyard ADU, our team takes the project from the first drawing to the last coat of paint, and stays your single point of contact even when a partner builds new structure. Living in a condo or townhome instead? Our condo remodeling page covers HOA approval and building rules.

Walls, ceilings, doors, trim, lighting and paint, room by room or across the whole house, with the layout planned around how you live.
Learn more about interior remodeling →
Siding, stucco, windows, doors and exterior paint that renew the outside of your home and protect it from the weather.
Learn more about exterior remodeling →
Hardwood, engineered wood, luxury vinyl plank and tile installed throughout the house, with baseboards and stairs finished to match.
Learn more about flooring installation →
New kitchens and bathrooms as part of a whole-home remodel, or as a project of their own, planned with the rest of the house.
Learn more about kitchens and bathrooms →
A garage turned into a bedroom suite, or a backyard ADU with its own kitchen and bathroom, for family, guests or rental income.

Walls opened between the kitchen, the dining room and the living room, with the structure checked and the permits filed.
Planning
Most homeowners start with a list of rooms. Here is how to decide whether to remodel in phases or all at once.
The kitchen this year, the bathrooms next. Each phase is planned, priced and built on its own.
Choose phases if you want to spread the cost and keep most of the house in use.
Kitchen, bathrooms, floors and layout changes planned together and built in one sequence.
Choose all at once if you are opening walls, moving rooms or redoing the floors throughout.
Timelines reflect typical on-site construction. Planning, design and permit approvals may require additional time. Project duration varies based on home size, scope of work, material availability and structural changes. Your schedule is confirmed in your written estimate.
Planning your budget
Several rooms with a limited scope typically run $30K to $70K. A larger remodel with new kitchens, bathrooms and floors runs $70K to $180K, and a whole-house renovation starts at $180K to $500K or more. Each level below shows what is usually included and what makes the price climb.
Limited scope, no major layout changes.
Same footprint, most rooms new.
A starting range: structural work can cost significantly more.
Use these numbers to plan, not as a bid. Interior remodeling on its own usually runs $5K to $25K, $30K to $80K or $80K to $200K+, depending on the scope. Your own price arrives as an itemized estimate after we walk the house. For a deeper breakdown, see the full home remodeling cost guide and our pricing guide for the whole Bay Area.
How it works
A whole-house project runs through six stages, from the first walkthrough to handing you a finished home, and the plan, the budget and the phases are agreed before demolition. More about how we manage a remodel.
Construction typically takes 4 to 8 months. Design, permit approvals, material availability and project complexity can affect the overall timeline. Your schedule is confirmed in your written estimate.
We tour the house with you, note what works and what does not and measure the rooms involved. The visit is free.
We plan the new layout with you and help you choose cabinets, tile, flooring, fixtures and finishes for every room.
You receive a priced plan for every phase. We draw the plans, bring in an engineer when walls move and file the permits.
We protect what stays, open the walls and update structure, plumbing, electrical and HVAC where the plan calls for it.
Drywall, cabinets, tile, flooring, trim and paint go in, room by room, in the order we planned with you.
We go room by room with you, list the last details, fix them and only then call the house finished.
Projects
Six real projects, from a whole-home renovation to garage conversions and a two-unit ADU. Every photo on this page comes from our own work.

Kitchen, bathrooms, bedrooms, flooring and exterior renewed, with a covered patio and a pool in the backyard.

A modern two-story home built from the ground up, with large windows facing the water.

A separate backyard suite with its own kitchen, a full bathroom and a living and sleeping area.

A garage turned into a finished bedroom suite with a full bathroom and new flooring.

A garage converted into a studio ADU with a kitchen, a tiled walk-in shower and its own entrance.

Two independent living units, a loft suite and a studio apartment, each with a kitchen and a bathroom.
Our work
Rooms, bathrooms, kitchens and backyards from our whole-home remodels and ADUs, photographed after the crew left. Open any photo for the full-size view, or explore the rest of our portfolio.
Why Partners
A whole-home remodel puts a crew in your house for months. Here is what homeowners say made them comfortable choosing us.
Maurelio and his son João Luiz run Partners Remodeling. Maurelio visits your house at each phase of the home renovation: layout, rough-in, finishes and the final punch list. Decisions are made with the owner, not passed through a chain of managers.
On a project that lasts months, continuity matters. The same crew frames, tiles, installs the floors and finishes the trim. They know where every pipe and wire went and keep the quality even from the first room to the last.
Partners Remodeling holds a California residential remodeling license (B-2), CSLB #1130522, with a bond and insurance. For the foundation and framing of a new ADU we team up with a partner licensed for new construction. You can verify any license on the state board’s site.
Moving walls, adding rooms or converting a garage takes drawings, often an engineer, and permits. We coordinate all three with your city or county, from Contra Costa to the Peninsula, and keep the inspections on schedule.
Before work begins you receive a written, itemized estimate that splits the project into phases with prices and dates. The walkthrough is free, so you can weigh a full remodel against doing it in stages with real numbers.
Rooms outside the work zone are sealed off and their floors covered, and the site is tidied at the end of each day. We agree with you on the order of the rooms, so part of the house always stays usable.
Reviews
Feedback posted on Google and Thumbtack by homeowners whose floors, stairs and rooms we redid. Read the full list.
I like how they have a very clear contract laying out what's included in the quotes. Their price is competitive, and the workmanship is excellent. They also listened to my feedbacks on how to arrange the color of the pieces, as there are some variations in different boxes of the materials. I hired them for 2500 sqft job, they finished it in 12 days...
...completely transformed the look of our home, adding elegance and durability.
I am so happy I have met Maurelio and his team. They are very professional and always on time! He is such a hard worker that he even work on weekends and stays over tile 8PM just to finish everything. When it comes to work he and his team are very detailed oriented! Specially in doing intricate designs and the stairs! My husband is very amazed on how they did all the curves of our stairs. He is very honest too! Our house was a newly built house and when they removed the baseboard after they changed the carpet to vinyl he have noticed that our builder didn't paint the walls down to the bottom and if he puts the old baseboard back its going to show a huge part that wasn't painted. What he did was to change the whole baseboard... We also love that he makes sure that all payments have receipts and send us updates (picture and videos) while we were away... 5 stars are not enough to rate your service!
Service areas
Based in Brentwood, in Contra Costa County, we take on whole-home projects in Walnut Creek, Concord, Antioch, Oakland, Fremont, San Jose and the neighborhoods between them. That reach covers the full nine-county Bay Area.
Free estimates in all 9 counties
Type your city to check instantly.
Loading map...
Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.
FAQ
What Bay Area families usually want to know before a whole-house project. Other topics are covered on our general FAQ.
The scope drives it: how much of the house is included, whether walls move, how many kitchens and baths are involved and what turns up behind the walls. As a planning range, updating several rooms with paint, flooring and finishes runs about $30K to $70K. A larger remodel with new kitchens, bathrooms and floors runs $70K to $180K. A whole-house renovation starts around $180K to $500K, and structural changes often cost significantly more. See what affects the price.
Often yes for a remodel that keeps the footprint, such as a new kitchen, updated bathrooms and new flooring, which falls in our $70K to $180K planning range. Opening walls, moving rooms or converting a garage usually takes the budget higher. During the walkthrough we show you which rooms your budget covers first.
Construction typically takes 4 to 12 weeks per phase when you remodel one or two rooms at a time. Doing the whole house at once takes about 4 to 8 months. Counting design and permit approvals, most whole-house projects take about 8 to 14 months from the first design meeting to the final walkthrough. The exact time depends on your city, the size of the house and any structural changes. Each phase gets its own dates in the estimate, agreed before construction begins. See every step.
Most remodels that move walls, change plumbing or electrical or convert a garage need a permit, and structural changes may also need engineering. Cosmetic work like paint or replacing flooring usually does not. Our team prepares the drawings, coordinates the engineer and files everything with your city or county.
Start with anything structural or anything that opens walls and floors: layout changes, the foundation and the roof. Next come plumbing, electrical and HVAC, then insulation and drywall, and only after that cabinets, tile, flooring, trim and paint. Following this order keeps finished surfaces from being torn up again later. Read more about sequencing a whole-home remodel.
Square footage alone does not set the price: the same 2,000 square feet can mean fresh paint and floors or all-new kitchens, baths and systems. Using our planning ranges, a few rooms with a limited scope come to about $30K to $70K, new kitchens, bathrooms and flooring to $70K to $180K, and a full renovation of the house begins near $180K and can pass $500K. We price your house room by room after the walkthrough.
Remodeling usually makes sense when you like your neighborhood and the house has good bones but no longer fits how you live. Moving avoids construction but adds selling and buying costs and a new mortgage. We help you price the remodel so you can compare with real numbers. Read our guide full home remodel vs. moving.
Phases spread the cost and keep most of the house in use, but each phase has its own setup and you live with construction longer. Doing it all at once is usually more efficient when many rooms need work or walls are moving. Compare both options, and we will help you decide at the free visit.
Yes. We convert garages into bedroom suites or studios and build backyard ADUs with their own kitchen and bathroom, with the plans, the utilities and the permits handled. The foundation and framing of a new ADU are built with a partner licensed for new construction.
Yes. We install hardwood, engineered wood, luxury vinyl plank and tile throughout the house, including stairs and baseboards, either on their own or as part of a larger remodel. See our flooring installation service.
Kitchens and bathrooms are usually where buyers notice the difference first, followed by flooring, paint and curb appeal. Added living space, like an ADU, can also add rental income. The right choice depends on your house and your plans. Read our guide on home renovations that add value.
Maurelio, the owner, follows every phase in person, and the crew doing the framing, tile, flooring and finishes is the one he has worked with for years. Your house is not passed from one subcontractor to the next.
Home remodeling guide
The questions we answer most often before a whole-house remodel or an ADU, written up by the people who build them.
Much of the Bay Area housing stock was built decades ago, with closed-off layouts, small kitchens and bathrooms, and electrical and plumbing systems sized for a different way of living. A whole-house remodel is often the moment those systems get updated: a larger electrical panel, new circuits for the kitchen, replacement of old galvanized pipes and better insulation.
Planning for it early keeps a home renovation on track. Walking every room before we quote lets us spot likely bearing walls, realistic plumbing routes and the upgrades your building department will ask for. We also recommend a contingency for whatever is hidden inside the walls.
Paint, new flooring and replacing fixtures in place usually do not need a permit. Removing a wall, moving plumbing, adding circuits, building an ADU or converting a garage almost always does, and a load-bearing wall or a new ADU usually needs structural engineering as well. Plan review, fees and inspection timing differ between the many cities and counties of the Bay Area.
California also has statewide rules that shape a remodel, from the Title 24 energy code for lighting, insulation and windows to state laws that allow ADUs on most single-family lots. We account for those rules while drawing the plans, not after an inspector points them out, and since we file the permits, their timing is built into the phase schedule.
In a whole-house remodel the order of the work matters as much as the finishes. Structure and anything that changes the layout come first. Plumbing, electrical and HVAC follow while the walls are open, then insulation and drywall, and only then cabinets, tile, flooring, trim and paint. Installing new floors before the walls are finished, for example, usually means protecting or redoing them later.
If you remodel in phases, plan the phases in the same logic: do the work that opens walls and floors first and save the cosmetic updates for later. A written plan for the whole house, even if you build it over several years, keeps each phase from undoing the last one. Compare phases and a single project.
When the house is simply too small, there are two common ways to gain living space without moving. A backyard ADU builds a separate unit with its own kitchen and bathroom. A garage conversion turns existing space into a bedroom suite or a studio, usually for less than building new.
Each option has different rules for setbacks, height, parking and utilities, and they vary from city to city. The right one depends on your lot, your budget and whether the new space is for family, guests or rental income. You can see examples of both in our projects above.
First confirm the license on the state CSLB lookup: an active license that matches the work, plus a bond and insurance, is the minimum for a whole-house job. Then ask how the contractor sequences the trades, who supervises the site day to day and whether every phase is priced in writing.
Keep California’s deposit cap in mind as well: for home improvement work the down payment may not exceed 10 percent of the contract or $1,000, whichever is smaller. Photos of complete homes the company has finished, like our projects, show more than ratings alone.
Starting from Brentwood, our whole-house projects reach Solano and Napa to the north, the Peninsula and San Francisco to the west and Santa Clara to the south. An older Oakland Craftsman, a Concord ranch house and a San Jose two-story each come with their own layouts, building departments and rules for ADUs.
The approach does not change with the address: a free walkthrough, a phased written estimate, permits handled and one crew throughout. Book your free home remodeling estimate and tell us which rooms you have in mind.

Ready to start
Schedule a free walkthrough. We look at every room you want to change, talk through priorities and budget, and follow up with a phased estimate and timeline. No commitment required.
Black Friday Special
Partners Remodeling | Black Friday Special
Save on tile for your shower walls and floors when you sign your contract November 20 through December 4, 2026.
Get My Estimate