Call now Free estimate

Pool deck and pool area remodeling, done as one project.

New deck surfaces, shade, lighting and an outdoor kitchen around your existing pool, planned together by a family-owned Bay Area contractor. California license CSLB #1130522.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Bay Area pool areas

Everything around the pool, remodeled together

A pool is often the reason a family bought the house, yet the deck around it is cracked, the sun is relentless and there is nowhere to cook or sit in the shade. Maurelio and João Luiz plan the pool area as one project: the surface you walk on, the shade, the lights and the kitchen, built in the right order.

One thing we want to be clear about: we do not work on the pool itself. Replastering, waterline tile, coping and pumps belong to a licensed swimming pool contractor (C-53). If your pool needs that work, we schedule our part around theirs so the two crews never undo each other.

  • New pool deck surfaces
  • Pavers, travertine and porcelain
  • Pergolas and cabanas for shade
  • Outdoor kitchens by the pool
  • Lighting and outlets
  • Planting areas and walkways

In brief

Pool area remodeling at a glance

Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Prices checked

The cost of a new pool deck depends mostly on the surface. As planning ranges per square foot, a coated concrete finish runs about $4 to $8, brick pavers $12 to $20, travertine $15 to $25 and porcelain pavers $18 to $28, while artificial turf for lawn areas costs $3 to $6. A 600 square foot deck in travertine would therefore land around $9,000 to $15,000 before shade, lighting or a kitchen are added, and most pool area projects take 3 to 6 months from design to clean-up. Partners Remodeling, a family-owned licensed contractor from Brentwood, remodels the area around Bay Area pools; work on the pool shell, tile and equipment is done by a licensed pool contractor.

Coated concrete
$4 to $8 per sq ft
Brick pavers
$12 to $20 per sq ft
Travertine
$15 to $25 per sq ft
Porcelain pavers
$18 to $28 per sq ft

Per-square-foot ranges are for planning only. Demolition of the old deck, drainage, steps and the shape of the yard change the total, which is set in a written estimate after we measure the space.

What we build

What a pool area remodel can include

Most clients combine several of these into one plan, so the deck, the shade and the wiring are built once and in the right order.

Pool deck and lawn behind a two-story home

Pool Deck Resurfacing

A new walking surface over or in place of the old deck: coated concrete, pavers or stone, sloped so water drains away from the pool.

Explore pool deck resurfacing →
Long pool with a lounge deck beside it

Pool Deck Pavers and Stone

Travertine, porcelain or brick pavers that stay cooler underfoot and can be lifted and reset if the ground ever moves.

Modern pergola beside a pool with LED lights

Pool Cabanas and Pergolas

A pergola or pool cabana that gives you a shaded place to sit between swims, with room for fans and lights.

Outdoor kitchen counter next to a spa

Poolside Outdoor Kitchens

A grill, counter and bar seating a few steps from the water, so whoever cooks is still part of the party.

Pool area with lights on at dusk

Lighting and Power

Path lights, lighting in the shade structure and GFCI-protected outlets, placed to meet the electrical code for pool areas and planned with the deck.

Covered patio with a wood ceiling and a ceiling fan

Covered Lounge Areas

A covered seating area next to the house that frames the view of the pool and gives the yard a real living room.

Deck materials

Which pool deck material is right for you?

Five common surfaces around Bay Area pools, with planning prices per square foot and what each one is good and not so good at. Before you decide, look at real samples in direct sun and when wet: color, heat and grip change more than you would expect.

Coated concrete

$4 to $8

per square foot

  • Lowest cost and a textured, cooler finish over sound concrete
  • Needs a recoat over the years and shows cracks in the slab below
Brick pavers

$12 to $20

per square foot

  • Classic look; single pieces can be replaced
  • Joints need sand or sealing to stay tidy
Travertine

$15 to $25

per square foot

  • A travertine pool deck stays cooler in the sun
  • Should be sealed, and prices vary by grade
Porcelain pavers

$18 to $28

per square foot

  • Dense, stain resistant and available in stone and wood looks
  • Highest price; needs a slip-rated finish near water
Artificial turf

$3 to $6

per square foot

  • Green area with no mowing or watering
  • For lawn zones away from the pool edge, not the deck itself

What else moves the price of a pool area

1Removing the old deckBreaking out and hauling old concrete adds labor before anything new goes down.
2DrainageWater has to slope away from the pool and the house, which can mean new drains or regrading.
3Steps and level changesStairs, retaining edges and raised areas take more material and more cuts.
4Shade structuresA pergola or cabana is often the largest single item in a pool area plan.
5Power and gasLighting, outlets and a gas line for a grill are trenched before the deck is finished.
6Pool work in the same seasonIf the pool is being replastered too, both jobs have to be sequenced so the new deck is not damaged.

The ranges come from our planning price list and are not a quote. Your price is itemized after we measure the deck and see the condition of what is there today.

Clear scope

Who handles the pool, and who handles the area around it?

A pool remodel usually involves two kinds of contractors. Knowing who does what keeps the schedule and the warranty questions simple.

Licensed pool contractor (C-53)

The pool itself

Everything that holds or moves the water.

Surfaces
Replastering, pebble or quartz finishes
Edges
Waterline tile and coping stones
Equipment
Pumps, filters, heaters and pool lights
Structure
Cracks and leaks in the shell

Call them if the plaster is rough, tiles are falling off or the pool loses water.

Partners Remodeling

Everything around the pool

The spaces where you walk, sit, cook and gather.

Surfaces
Deck coatings, pavers, stone and turf
Shade
Pergolas, cabanas and covered lounges
Cooking
Grills, counters and bar seating
Lighting
Path lights, outlets and fixtures

Call us if the deck is cracked or hot, there is no shade or the yard does not work for gatherings.

When both are needed, the pool work usually comes first and the new deck goes in after, so the finished surface is not damaged by plaster or tile crews.

Step by step

From a tired deck to your first swim

Six steps take the area around your pool from the first visit to a finished space. See how we manage our projects.

Pool area with a modern patio roof, an outdoor kitchen and a spa Aerial view of a backyard pool and yard
Typical total time 3 to 6 months from the first visit to the final walkthrough

Timelines vary based on project scope, permit approvals, material availability, weather conditions and coordination with any pool work. Your written estimate confirms the schedule.

  1. Visit to the pool area

    1 visit

    We look at the deck, drainage, sun and access, measure the space and ask how your family uses the pool. Free of charge.

  2. Layout and surfaces

    2 to 4 weeks

    We draw where the deck, shade, kitchen and lights go and help you pick a surface that suits your budget and your feet.

  3. Estimate, permits and timing

    2 to 8+ weeks

    You get an itemized price. We file any permits the plan needs and, if your pool is being serviced too, line up dates with the pool contractor.

  4. Demolition and groundwork

    1 to 2 weeks

    The old deck comes out, the base is prepared and sloped, and conduits and lines for power and gas go in.

  5. New surfaces and features

    3 to 8 weeks

    Pavers, stone or coating are installed, then shade, kitchen and lighting, with the pool protected the whole time.

  6. Clean-up and walkthrough

    1 to 3 days

    We clean the deck and the pool edge, walk the space with you and leave it ready for the first swim.

Why Partners

Why families trust us with their pool area

Working around a pool means water, chemicals, children and pets nearby. These are the habits clients notice.

An honest scope

We tell you up front what we build and what a pool contractor should handle. You never pay us for work outside our license.

The pool stays protected

We cover the water and the edge during demolition and cutting, and clean the pool line before we leave each day.

An owner you can call

Maurelio checks the base, the slopes and the finished surface himself. Questions go to an owner, not a dispatcher.

Licensed and bonded

Our California license, CSLB #1130522, is active and bonded. You can look it up on the state board’s site before you sign.

Every item priced

Deck, shade, kitchen and lighting are listed separately in your estimate, so you can build the whole plan now or in stages.

Rated 4.9 and 5.0

60 Google reviews and 49 on Thumbtack say the same thing about how we work. A few are below.

From our projects

Pool areas in homes we worked on

Pools appear in several of our larger projects. These photos show the spaces around them; for the full projects, visit our portfolio.

Pool and lawn behind a renovated two-story home

Pool and lawn in a whole-home renovation

The backyard of a modern farmhouse we renovated, with the pool framed by lawn and a covered patio.

Freestanding pergola with LED lights beside a pool

Pergola beside the pool

A freestanding pergola with built-in lights and fans that shades the pool deck.

Outdoor kitchen counter next to a spa under a patio roof

Outdoor kitchen next to the spa

A covered kitchen and bar a few steps from the spa and the pool deck.

Reviews

Clients on our work and our crew

Real reviews from Google and Thumbtack, written by people who hired us for work at their homes. Read more reviews.

  • Sergio CostaStaircase remodel
    ...completely transformed the look of our home, adding elegance and durability.
  • Scott S.Flooring and baseboards
    Pedro and crew were a pleasure to do business with. They carefully listened and responded to all concerns with resolutions. The results of our viny planks flooring, baseboards and transitional thresholds were above satisfactory. Would highly recommend Partners Floor.
  • Karen D.Whole home flooring
    I like how they have a very clear contract laying out what's included in the quotes. Their price is competitive, and the workmanship is excellent. They also listened to my feedbacks on how to arrange the color of the pieces, as there are some variations in different boxes of the materials. I hired them for 2500 sqft job, they finished it in 12 days...
    Room with new engineered hardwood flooring and French doors to the patioClose view of the new engineered hardwood planks in the sunlightBedroom with new engineered hardwood flooring and plantation shuttersDining area with new engineered hardwood flooring next to the pool doors

Service areas

Pool areas we remodel across the Bay Area

From Brentwood, in Contra Costa County, we remodel pool decks and backyards in Walnut Creek, Concord, Antioch, Danville, Pleasanton, San Jose and the towns around them. All nine Bay Area counties are inside our service area.

Free estimates in all 9 counties

Do we remodel homes in your city?

Type your city to check instantly.

37cities
9counties
24/7we answer

Loading map...

Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.

FAQ

Pool deck and pool area questions

Straight answers about what we do around pools, and what we leave to pool specialists. More topics are on our FAQ page.

It is usually priced per square foot. As planning ranges, a coated concrete finish costs about $4 to $8, brick pavers $12 to $20, travertine $15 to $25 and porcelain pavers $18 to $28. Removing the old deck, drainage and steps add to that. Compare the materials.

No. Replastering, waterline tile and pool equipment are done by contractors with a California swimming pool license (C-53), and coping goes through our C-53 partner. We remodel the deck and everything around the pool, and we coordinate dates when both jobs happen the same season.

Coping is the cap on the pool wall, so it is part of the pool itself. We handle it through a partner with a California C-53 license, and we plan the new deck to meet it cleanly.

It depends on budget and feel. Travertine and light-colored coatings stay cooler in the sun, porcelain resists stains and comes in many looks, and brick or concrete pavers can be lifted and reset if the ground moves. Near the water, any surface should have a slip-resistant finish.

Travertine is popular around pools because it stays cooler than many surfaces and has a natural texture. It should be sealed to resist stains and chlorine, and its price depends on the grade and finish you choose.

Yes. A stand-alone deck job is fine, and it can be a coating or new pavers. See pool deck resurfacing for surfaces, prices and timing.

Repairing or coating is cheaper when the concrete is sound and only the surface is worn, stained or lightly cracked. If the slab has sunk, lifted or cracked all the way through, a coating only hides the problem for a while; replacing it with pavers or stone costs more up front but lets us fix the slope and drainage at the same time. We check the slab at the visit and tell you which makes sense.

Replacing a deck surface often does not need one, but new electrical or gas lines do, and so do many shade structures, especially attached ones. Areas around pools also have safety barrier rules. We check your city’s requirements and file the permits the plan needs.

We cover the water and the edge while we break out the old deck and cut new material, keep debris away from the skimmers and clean the pool line at the end of each day.

Yes. A pergola or cabana is one of the most requested parts of a pool area plan, and it can include fans, lights and outlets. We size it for the space and the sun and plan its footings before the new deck goes in.

Plan on about 3 to 6 months overall. Layout takes 2 to 4 weeks and the estimate and permits 2 to 8 weeks or more. On site, demolition takes 1 to 2 weeks, new surfaces and features 3 to 8 weeks and the clean-up 1 to 3 days. Some steps overlap, and approval times depend on your city and the type of work. See the six steps.

Pool area guide

Planning a pool area remodel in the Bay Area

What to think about before you replace a pool deck or add shade and a kitchen next to the water.

Signs your pool deck needs work

Cracks that keep widening, slabs that have sunk or lifted, puddles that sit after a swim and a surface that is slick when wet are the usual signs. Gaps where the deck meets the coping can also let water under the slab, which makes the problem worse over time.

Sometimes a coating over sound concrete is enough. When the slab itself is broken or uneven, replacing it with pavers or stone usually lasts longer and gives you a chance to fix the slope at the same time.

Keeping the deck cool and safe

Inland Bay Area summers can make dark concrete too hot for bare feet. Lighter colors, travertine and textured coatings stay noticeably cooler, and a pergola or cabana adds shade where people actually sit.

Safety matters as much as comfort. Any surface within a few feet of the water should have a slip-resistant finish, and the deck should slope away from the pool so splash water and rain drain off instead of pooling.

Quick facts about Partners Remodeling
  • Family-owned contractor led by Maurelio and João Luiz
  • California license CSLB #1130522, active and bonded
  • Based in Brentwood, serving 9 Bay Area counties
  • More than 15 years of remodeling experience
  • 4.9 on Google from 60 reviews, 5.0 on Thumbtack from 49 reviews
  • Free visit with a written, itemized estimate

Pool work and deck work: the right order

If the pool needs new plaster, tile or coping, that work normally comes first. Pool crews need access to the edge and produce dust and debris that can stain a new deck. Once they are done, the deck can be built up to the finished coping.

Coordinating the two schedules saves money and frustration. We talk with your pool contractor about dates and edge details so the new deck meets the pool cleanly.

Safety barriers and permits

California’s Swimming Pool Safety Act sets safety feature requirements for home pools, such as barriers, door alarms or covers, mainly when a pool is built or remodeled under a building permit. A remodel of the area around an existing pool is a good moment to check that gates, fences and alarms still do their job.

A new deck surface often needs no permit, but electrical circuits, gas lines and many shade structures do. Requirements differ from city to city, so we confirm them before the work is scheduled.

Electrical safety near the water

Pool areas have their own section of the California Electrical Code (Article 680). Deck surfaces and metal parts close to the water are bonded so they stay at the same electrical potential, outlets near the pool need GFCI protection and must keep a minimum distance from the water, and light fixtures have limits on where they can go.

Those rules matter most when the old deck comes out or new lighting goes in. Before the surface is installed, we confirm the requirements with your city and the licensed electrician on the project, so the wiring and bonding are inspected while they are still accessible.

Planning shade, cooking and seating

Think about how the area is used across a whole day. Morning coffee, afternoon swims and evening dinners each need a different spot: a sunny corner, shade close to the water and a lit dining area near the kitchen. Placing those zones first makes the deck layout obvious.

Utilities should be planned before the surface goes down. Conduits for lights and outlets and a gas line for a grill are far easier to run under a new deck than to add later. See our outdoor living page for pergolas, covers and outdoor kitchens in more detail.

Pool areas across the Bay Area

We work from Brentwood across the nine Bay Area counties, where pools are common in the warmer inland valleys of Contra Costa, Alameda and Santa Clara. Each city has its own permit process, and each yard has its own sun, slope and soil.

The visit is free and the estimate is written and itemized. Ask for your pool area estimate and tell us what you would like to change around the water.

Outdoor bar under a patio roof with a view of the water

Free visit

Make the space around your pool a place to stay

We come out, measure the deck, look at sun and drainage and send a written estimate with each part of the plan priced on its own.