Call now Free estimate

Kitchen design in the Bay Area, drawn before we build.

Layout, storage, lighting and finishes planned with you and drawn to scale, by the family team that will build your kitchen. Design is part of every Partners kitchen remodel, with no separate design fee.

Thank you.We received your request and will contact you shortly.
  • 4.9 on GoogleFrom 60 homeowner reviewsRead reviews ›
  • 5.0 on Thumbtack49 reviews · Top Pro 2022 to 2024Read reviews ›
  • Licensed and insuredCalifornia CSLB #1130522
  • Permits handledWe file them with your city

Design-build kitchens

A good kitchen design starts with how you cook

Where the trash goes, which drawer holds the pots, how two people pass each other at the island: these details decide whether a new kitchen works. Before anything is ordered, Maurelio and João Luiz sit down with you, measure the room and draw the plan around your habits, your appliances and your budget.

We design kitchens as part of the remodel we build, so every line on the plan is something our own crew will install. That keeps the drawing realistic: the price, the plumbing and the electrical are checked while the design is still on paper, not after the walls are open.

  • Layout planned around your cooking
  • Cabinet and storage plan
  • Lighting and outlets mapped
  • Countertop, tile and fixture choices
  • Floor plan drawn to scale
  • Plans ready for the permit

Quick answer

Kitchen design with Partners: the short answer

Reviewed by Maurelio, owner of Partners Remodeling (CSLB #1130522). Last reviewed

Partners Remodeling, a family-owned contractor in Brentwood, California, designs every kitchen it remodels, so the kitchen remodel design and the construction come from one team. The design takes about 2 to 4 weeks: Maurelio and his team measure the room, plan the layout, storage, lighting and finishes with you and draw a floor plan to scale. Design is included in the price of the remodel, with no separate fee. It is not sold on its own, because the same team builds what it draws. The plan then becomes your written, itemized estimate and, when needed, the permit drawings for your city.

Design time
2 to 4 weeks
Design fee
Included in the remodel
You receive
A floor plan to scale
Designed by
Maurelio and our team

What you get

What your kitchen design includes

Six decisions shape every kitchen we draw. We settle each one with you before the estimate, so the plan you approve is the kitchen we build.

Layout and work zones

Sink, cooktop and refrigerator placed so the steps between them stay short, with landing space beside each one and room for a second cook to work without crossing paths.

Island or peninsula

Whether an island fits, how wide the walkways around it should be, and what it holds: seating, a prep sink, drawers for pots or the microwave.

Cabinets and storage map

Which drawer holds the pots, where the spices, trash and recycling go, how tall the uppers run and how the corners and the pantry are used, item by item.

Lighting and outlets

Recessed, pendant and under-cabinet lights planned in layers, with the outlets and circuits the appliances need and the lighting rules California’s Title 24 sets for kitchens.

Materials and colors

Cabinet style and color, countertop, backsplash, flooring, hardware and fixtures chosen together, so the finishes match and each one fits the budget line it belongs to.

Plan drawn to scale

A floor plan with every measurement, the appliance positions and the cabinet runs. It is the drawing we price from and, when your project needs one, the basis for the permit.

Choosing who designs

Independent kitchen designer or a design-build contractor?

Both routes can lead to a great kitchen. The difference is who connects the drawing to the price, the permit and the construction.

Independent designer

Design first, contractor later

A designer plans the kitchen and hands you the drawings. You then look for a contractor to price and build them.

Design fee
Usually charged separately, hourly or as a flat fee
Price known
After contractors bid on the finished design
Permits
Depends on who you hire to build
You coordinate
Designer, contractor and suppliers

Fits best if you mainly want design guidance and plan to manage the build yourself.

Design-build with Partners

One team designs and builds

Maurelio and our team draw the kitchen, price it line by line and build it with our own crew.

Design fee
Included in the price of the remodel
Price known
While the design is still on paper
Permits
We prepare the plans and file them
You coordinate
One team, one phone number

Fits best if you want the design, the budget and the construction to stay in one set of hands.

We design kitchens only for the remodels we build; we do not sell the drawings on their own. If you already have plans from a designer or an architect, bring them to the free visit and we will price them.

How it works

From first measurement to an approved kitchen plan

Kitchen design is the first stage of every remodel we build. These four steps happen before any demolition, so you know the layout, the price and the dates in advance. The rest of the project is explained on our kitchen remodeling page.

Breakfast nook beside an emerald green pantry wall in a kitchen layout we planned Emerald shaker sink cabinet with brass pulls and a stainless steel sink
Typical design time 2 to 4 weeks from the first visit to the approved plan

A simple layout with few changes is quicker, while special-order cabinets or several rounds of revisions take longer. Permits, when required, come after the design and are counted in your schedule.

  1. Visit, measurements and wish list

    1 visit

    We measure the kitchen, check where the plumbing, gas and electrical run today and listen to what works and what bothers you. Free, with no commitment.

  2. Layout options on paper

    Weeks 1 to 2

    We sketch the layout, the island and the storage around your habits and walk you through the trade-offs, such as what it costs to move the sink.

  3. Finishes and appliance choices

    Weeks 2 to 4

    Cabinets, countertops, backsplash, flooring, lighting and fixtures are chosen together, and the appliance sizes are locked into the plan.

  4. Approved plan and written estimate

    End of design

    You approve the plan drawn to scale and receive an itemized estimate with the schedule. If the work needs a permit, the same plans go to your city.

Kitchen design styles

Kitchen design ideas from kitchens we built

Each photo below is a Bay Area kitchen our team planned and built. Bring the ones you like to the design visit, together with pictures you saved, and we start the plan from there. See more of our projects.

White shaker kitchen with a quartz island and stainless appliances

Classic white shaker

Shaker doors, quartz counters and simple hardware that stay in style for decades.

Navy blue shaker cabinets with a brass range hood and marble-look backsplash

Bold color and brass

Navy or green cabinets with brass hardware and a statement hood over the range.

Two-tone kitchen with dark lower cabinets, white uppers and a white island

Two-tone cabinets

Dark lowers with light uppers, or the reverse, to make a large kitchen feel balanced.

Open-concept kitchen with walnut cabinets, marble counters and a long island

Warm wood and marble

Walnut or oak cabinetry with marble or marble-look counters in an open plan.

Modern kitchen with flat-panel cabinets, a waterfall quartz island and LED toe-kick lighting

Modern flat-panel

Handleless flat doors, waterfall counters and hidden LED lighting for clean lines.

Dark shaker kitchen with granite counters and a professional range

Dark cabinets and stone

Deep wood tones with granite or quartzite for a kitchen that hides daily wear.

Reviews

How clients describe planning with us

Real Google reviews in which homeowners talk about the design stage: ideas, recommendations and choosing materials. Read all our reviews.

  • Tina ThurmanKitchen remodeling
    So thankful for Partners Remodeling, they did such an amazing job on my kitchen. It is exactly how I envisioned it. They were super quick and detail oriented, everything is absolutely perfect!!
  • DeteeSeveral rooms, repeat client
    I couldn't have asked for a better Remodel team. Maurelio and his team were top notch in every way - quality, level of detail, transparency, calibration of ideas as you go with a consciousness to cost, ensuring the project was completed on time - everything was impeccable. They are everything you want in your remodeling partner and I will be working with them as I get my entire home remodeled. From bathrooms, to fireplace to stairway, kitchen and cabinets - their qualified team of professionals partner with you and take pride in the project as if it's their own home! I'm a very satisfied repeat customer!
  • James GangarTwo bathrooms
    Maurelio from Partners Remodeling was excellent. We used his company to remodel two bathrooms in our house. His was the best price out of the 3 quotes we obtained. Maurelio helped us every step of the way from design, choosing material and letting us know when to buy it, and making sure the vanities and other finishing materials we chose were compatible. We had an excellent experience and plan to use Partners Remodeling again soon.

Service areas

Kitchen design visits in 9 Bay Area counties

We come to your home to measure and plan, starting from Brentwood in Contra Costa County and reaching Walnut Creek, Concord, Antioch, Oakland, Fremont, San Jose and the North Bay. The design visit is free wherever you live in our nine counties.

Free estimates in all 9 counties

Do we remodel homes in your city?

Type your city to check instantly.

37cities
9counties
24/7we answer

Loading map...

Alameda County: Oakland, Fremont, Berkeley, Hayward, Pleasanton · Contra Costa County: Brentwood, Concord, Walnut Creek, Antioch, Danville · Santa Clara County: San Jose, Sunnyvale, Santa Clara, Palo Alto, Mountain View · San Francisco County: San Francisco · San Mateo County: San Mateo, Redwood City, Daly City, Burlingame, Menlo Park · Marin County: San Rafael, Novato, Mill Valley, Sausalito · Sonoma County: Santa Rosa, Petaluma, Rohnert Park, Sonoma · Napa County: Napa, American Canyon, St. Helena, Calistoga · Solano County: Fairfield, Vallejo, Vacaville, Benicia. See every city we serve.

FAQ

Kitchen design questions, answered

What homeowners ask us before the first sketch. For questions about the whole remodel, see the kitchen remodeling FAQ.

With Partners, kitchen design is included in the price of your remodel; there is no separate design fee. Independent designers usually charge on their own, by the hour or as a flat fee, before any construction is priced. Your total comes in a written, itemized estimate after the free visit, and our kitchen remodel cost ranges help you plan.

About 2 to 4 weeks from the first visit to the approved plan. A kitchen that keeps its layout moves faster; moving walls, the sink or the range, or comparing several layouts, adds time. When the work needs a permit, the city review starts after the design is approved.

No. We draw a floor plan to scale with the measurements, the cabinet runs and the appliance positions, and we walk you through it in person. We also show you finished kitchens and real material samples, so you can judge colors and finishes in your own light before anything is ordered.

No. We design kitchens only as part of the remodels we build, which is why the design is not charged separately. The plan is drawn by the people who will install it, so the price and the schedule are checked at the same time. If you already have plans from a designer or an architect, we can price and build them.

Maurelio, the owner of Partners Remodeling, with our team; you do not need to hire a separate kitchen designer. The same people visit your home, draw the plan, prepare the estimate and build the kitchen, so nothing agreed at the design stage gets lost on the way to the job site. Meet the family behind Partners.

Photos of kitchens you like, a list of the appliances you want to keep or buy, and a budget range. It also helps to note what frustrates you today, like not enough counter space or nowhere for the trash, and who cooks in the kitchen at the same time.

Usually, yes. Keeping the sink, the range and the dishwasher where they are avoids moving drains, gas lines and circuits, which often also avoids a permit. A new layout costs more, but it can fix a kitchen that never worked. We price both options during the design so you can compare. See what moves a kitchen budget.

The mistakes we see most often in kitchens we are asked to redo: no counter space next to the range or the refrigerator, walkways too narrow for two people or an open dishwasher, too few outlets, and only one ceiling light. Others are a trash pull-out far from the sink, upper cabinets that stop short of the ceiling and an island placed where it blocks the path to the table. A plan drawn to scale catches these before anything is built.

Yes, but the earlier the better. Once the cabinets are ordered, changes cost more and can delay the schedule. In California, any change to a signed home improvement contract is written down in a change order with the new price and dates, which you approve before the work changes. Our terms of use explain how estimates and contracts work.

Kitchen design guide

Kitchen design in an older Bay Area home: what to decide first

The questions we work through at every design visit, written down so you can think about them before we meet.

Choosing a kitchen layout for your room

The right kitchen layout starts with the room, not with a picture. Where the windows and doors are, which walls carry plumbing and which way people walk through the space decide what fits. A long, narrow room usually works as a single wall or two parallel runs. A room open on one side suits an L-shape, often with an island in front of it, and a closed square room can wrap three walls in a U.

At the design visit we also look at traffic: a kitchen that sits between the garage and the backyard needs a clear path that does not cut through the cooking zone. Moving a doorway a few feet can do more for a kitchen than a bigger island.

Kitchen island design: size and clearances

An island needs room around it to work. The National Kitchen & Bath Association (opens in a new tab) recommends work aisles of at least 42 inches for one cook and 48 inches for two, and that is the range we plan to. If the room cannot give those clearances, a peninsula or a slim rolling cart usually works better than a cramped island.

Decide early what the island is for. Seating needs a counter overhang and knee space; a prep sink or a cooktop needs plumbing, gas or a dedicated circuit run under the floor; deep drawers on the working side are often the best storage in the kitchen. Each choice changes the plan, the price and sometimes the permit.

Kitchen design with Partners at a glance
  • Design included in the remodel price, with no separate fee
  • Floor plan drawn to scale by Maurelio and our team
  • About 2 to 4 weeks from first visit to approved plan
  • Plans reused for the permit when the work needs one
  • California license CSLB #1130522, based in Brentwood
  • Free design visit in nine Bay Area counties

Small and galley kitchen design

In a small kitchen, every inch of wall and every drawer counts. Upper cabinets that run to the ceiling, a narrow pull-out pantry beside the refrigerator and drawers instead of base cabinets add storage without adding space. Counter-depth appliances keep walkways clear, and a single large sink often works better than a double bowl.

Galley kitchens are efficient because everything is a step or two away. We keep one side for cooking and the other for cleanup when the plumbing allows, avoid tall cabinets in the middle of a run, and use light colors and under-cabinet lighting so the room feels wider. Removing an upper run to open a galley to the next room changes it the most, and it starts with checking whether the wall is load-bearing.

Lighting, outlets and the rules that shape them

A good kitchen design lights the room in layers: recessed or ceiling lights for the space, under-cabinet lights for the counters and pendants or a fixture over the island or the table. Planning them with the cabinets means the wiring goes in before the drywall closes, instead of being added later with surface conduit.

California's energy code, Title 24, sets efficiency and control requirements for new lighting, and the electrical code decides how many countertop outlets and circuits a kitchen needs and where they go. We design to those rules from the first sketch, so the plan that you approve is also the plan that passes inspection.

Design decisions that move the budget

Most of the cost in a kitchen is decided on paper. Moving the sink, the range or the dishwasher means new drain lines, gas or circuits, and often a permit; keeping them where they are usually saves money. Custom cabinet sizes, natural stone, a waterfall island and specialty appliances all push the total up, while semi-custom cabinets and quartz keep it more predictable.

Because we price while we design, you see the effect of each decision before anything is ordered. See our kitchen cost ranges, cabinet options and countertop prices by material.

Designing around older Bay Area homes

Many Bay Area kitchens sit in houses built decades ago, with closed walls, a single circuit for the whole room and plumbing that was patched more than once. Before we draw a new layout we check which walls are likely load-bearing, where the drain can realistically move and what the building department will ask for once the walls are open.

Those checks keep surprises out of the schedule. When the design calls for removing a wall or moving plumbing, the same drawings become the permit set, and the inspections are part of the dates in your estimate. Book a design visit and we will walk your kitchen with you.

Kitchen with a turquoise herringbone backsplash and a quartz island built by Partners Remodeling

Ready to start

Let’s draw your new kitchen

Book a free visit: we measure your kitchen, listen to how you use it and plan the layout with you. Then you get a written estimate with the price and the dates, and you decide with no pressure.